...but only if it includes the condo. Painting is scheduled to be complete on Wednesday. Here are some photos of the downstairs almost done. We'll post some more photos once we get the floors cleaned-up.
Our adventure in Condo Living... buying and combining two condo units
Monday, January 31, 2011
Monday, January 24, 2011
Wine Door is Here...
The wine room door has been delivered (all 310lbs of it) and is been moved into place. In the meantime, our spare-bedroom-storage/staging-area is starting to fill-up.
Wednesday, January 19, 2011
Saturday, January 15, 2011
Water Feature...
Here's a photo of the water feature we designed to conceal the gas and power that has to route from the ceiling to the kitchen island. Look at the design drawing if it's not clear how it works from the photo.
Friday, January 14, 2011
Tuesday, January 11, 2011
Sunday, January 9, 2011
Saturday, January 8, 2011
Tape, Bed, & Float...
Work is proceeding on the Tape, Bed, & Float... which is expected to go through the coming week. Also, the insulation for the wine room (finally) arrived. It will be so "cool" once it's installed. And, the "jumbo" pocket door frame has been installed. The big (5' x 8.5') door has been built and will be delivered on Monday.
Tuesday, January 4, 2011
Wine Room...
Here's a look at the vapor barrier going in around the wine room. We needed to get the 6mil plastic sheeting and sheetrock finished on the outside so the tape & bed work can start tomorrow. The insulation will go in from the inside a few days from now because it will be delivered later than estimated. It was a special order because we are using an earth-friendly (LEED compliant) product called Roxul with a higher R-value that is actually made from stone.
Sunday, January 2, 2011
Saturday, January 1, 2011