Work is proceeding on the Tape, Bed, & Float... which is expected to go through the coming week. Also, the insulation for the wine room (finally) arrived. It will be so "cool" once it's installed. And, the "jumbo" pocket door frame has been installed. The big (5' x 8.5') door has been built and will be delivered on Monday.
Show the master bath
ReplyDelete