Sealer was applied to the stained concrete ceilings and columns over the weekend. A/V wiring wrapped-up yesterday as sheetrock was being delivered. In preparation for the inspector, hardie backer has been applied to the showers and all the walls sealed-up. We've called for the framing inspection today. If all goes well, sheetrock will start going up immediately after the inspection.
No comments:
Post a Comment